
Commercial Buildings
Shophouses, Cafés, Boarding Houses, Villas, Hotels, Auto Workshops, Offices, Warehouses, and Workshops. Design and Build in One Contract.
Consult
Trusted since 2014
Contractor for new builds, renovations, and structural steel fabrication for residential and commercial projects. Precise, transparent, and professional.



About us
/M2 Project is a construction services company. Our name comes from the unit most commonly used in construction, the square metre (m²): every square metre is measured, built, and accounted for.
With more than 10 years of experience in construction, /M2 Project has the expertise and capability to handle many kinds of construction work, from structural to architectural.
We keep up with the latest construction technology and methods. Every structure is designed in line with the Indonesian National Standard (SNI), with quality, precision, and safety as priorities throughout the work.

Services
Design, build, renovation, through to finishing. Large and small projects.

Shophouses, Cafés, Boarding Houses, Villas, Hotels, Auto Workshops, Offices, Warehouses, and Workshops. Design and Build in One Contract.
Consult




Precast Concrete Panel Fences for Homes, Plots, and Business Premises. Sturdy, Neat, and Quick to Install.
Consult

Filling, Levelling, and Compacting Soil with Heavy Equipment until the Land Is Ready to Build.
ConsultTell us what you need. Our team will visit your site for a survey.


Featured project
A suspension workshop built from empty land: design, land filling, steel fabrication, and three ready-to-use complexes.
Bank Panin GejayanBanking · Gejayan, Sleman
Bloomery Cake & PatisserieCommercial · Jl. Kaliurang, Sleman
Toll Road Rest AreaCommercial
South Jakarta HouseResidential · South Jakarta
Pak Imam's HouseResidential · Solo, Central Java
Two-Storey House, JangkangResidential · Jangkang, Sleman
Jl. Damai HouseResidential · Jl. Damai, Sleman
Cangkringan Concrete Panel FenceFence · Cangkringan, Sleman
Why us
Planning, Design, DED, Cost Estimate, and Construction handled by one team. One party responsible from start to finish.
The Foreman, Site Supervisor, and Company Leadership inspect the work in person.
Work progress is reported every day, without you having to visit the site.
Structures are designed to SNI and built to occupational health and safety (K3) standards.
Coverage
Our office is in Yogyakarta. Our team travels to your site anywhere in Java and Bali.
Our process
Talk through your needs and project plans with our team.
We check the land or building. Free across Jogja and Central Java.
Needs planning, concept design, and full working drawings (DED). The cost estimate (RAB) is broken down per work item, and every change or adjustment is recorded in an official report so costs stay transparent and under control.
The agreement covers the scope of work, schedule, payment terms, and maintenance period, all written into the contract. A work order (SPK) is then issued as the official start of work.
Building work follows the contract and cost estimate, with progress reports from the site.
After handover, we provide a maintenance period of 1–3 months for renovation work and 3–6 months for new builds, as part of our commitment to the quality of our work, except in cases of force majeure.
Our commitment
Scope, Specifications, Schedule, and Payment Terms are agreed before work begins.
Costs are broken down for every work item, so the project budget is clear and easy for you to track.
Progress at every construction stage is reported regularly, so you can follow along without visiting the site.
After handover, we provide a maintenance period of 1–3 months for renovation work and 3–6 months for new builds, as part of our commitment to the quality of our work, except in cases of force majeure.

How to calculate the cost of building a house per m² in Yogyakarta in 2026: what's included, extra costs, 5 factors that affect the price, and how to estimate a 100 m² house.
Read article
The stages of building a house and the documents at each stage.
Read article
Nine things to check before signing a contract with a contractor.
Read articleIt depends on the floor area, design, and material specifications. Pricing can be per m², lump sum, or unit price per item. After the site survey, you receive a detailed cost estimate (RAB) listing labour and materials for each work item.
Yes. After handover, a maintenance period applies: 1–3 months for renovation work and 3–6 months for new builds, except in cases of force majeure.
Materials and workmanship follow the Indonesian National Standard (SNI), with the specifications listed in the cost estimate, so clients know the type and quality of materials before work begins.
We carry out on-site surveys in Yogyakarta and Central Java. For other regions, the process starts with an online consultation to understand your project needs.
The down payment and instalments are agreed together, then paid according to work progress.
We take on projects across Java and Bali.
/ Start a project
Send your requirements, location, and photos of the current condition via WhatsApp. We’ll reply with the next steps.
Chat on WhatsApp