Construction began with filling and grading nearly 400 truckloads of soil on a 250 m² site, followed by levelling and compaction before the construction phase.

The building uses an IWF steel structure fabricated by our team, with comprehensive civil works from structural to architectural. The project also included widening a bridge and building a 5-metre-span access road over a 5-metre-wide drainage channel.

Through /M2 Project's design and planning, the workshop was developed into three main complexes: Workshop, Customer, and Administration. The complex includes an open area with a shady, green garden, as well as a comfortable waiting lounge with a billiard table and PlayStation.

We completed all of the work wholeheartedly and responsibly, delivering one of the largest and most comfortable suspension workshops in Indonesia.

Before & after

From construction to completion

Aerial view of the entire workshop complex, Jantra Kaki-Kaki Cirebon
Aerial view of the site at the start of work, Jantra Kaki-Kaki Cirebon
ConstructionFinal result
Drag to compare
Construction: Aerial view of the site at the start of workFinal result: Aerial view of the entire workshop complex
Documentation

Construction process

Photos in order, from the start to handover.

  1. 1
    Initial condition

    Initial site condition

    6 photos · click to enlarge

    • Old building and abandoned pond before work began
    • Gate and entrance bridge before work began
    • Old building on the site
    • Disused former pond
    • Old pond overgrown with bushes
    • Interior of the old building
    Old building and abandoned pond before work began
    Old building and abandoned pond before work began · 1/6
  2. 2
    Design

    Design & planning

    2 photos · click to enlarge

    • 3D model before construction
    • Workshop site plan
    3D model before construction
    3D model before construction · 1/2
  3. 3
    Construction

    Demolition of the old building

    Removing the old building's roof, Jantra Kaki-Kaki Cirebon
    Removing the old building's roof
  4. 4
    Construction

    Land filling & levelling (±400 truckloads of soil)

    9 photos · click to enlarge

    • Fill-soil trucks and a bulldozer on site
    • Fill-soil trucks entering the site
    • Fill soil over the former pond
    • Bulldozer clearing the land
    • Bulldozer levelling the fill soil
    • Compacting soil with a bulldozer
    • Level land, ready to build
    • Land after compaction
    • Final ground surface
    Fill-soil trucks and a bulldozer on site
    Fill-soil trucks and a bulldozer on site · 1/9
  5. 5
    Construction

    IWF steel fabrication · Nov 2022

    6 photos · click to enlarge

    • Crane arriving on site
    • IWF steel columns being erected
    • Installing the steel frame with a crane
    • Steel portal frame in place
    • Roof frame over the workshop area
    • Aerial view of the site at the start of work
    Crane arriving on site
    Crane arriving on site · 1/6
  6. 6
    Construction

    Bridge widening & site access

    3 photos · click to enlarge

    • Building the access over the drainage channel
    • Rebar for the access slab
    • Casting the slab with a concrete mixer truck
    Building the access over the drainage channel
    Building the access over the drainage channel · 1/3
  7. 7
    Construction

    Civil works, flooring & paving · Jan 2023

    9 photos · click to enlarge

    • Fill for the floor and yard
    • Yard and drainage works
    • Drainage and floor base
    • Laying paving blocks
    • Yard paving completed
    • Wall plastering and workshop structure
    • Steel roof frame of the billiard room
    • Front building structure
    • Aerial view during construction
    Fill for the floor and yard
    Fill for the floor and yard · 1/9
  8. 8
    Construction

    Floor finishing · Feb 2023

    2 photos · click to enlarge

    • Coating the workshop floor
    • Workshop floor after coating
    Coating the workshop floor
    Coating the workshop floor · 1/2
  9. Final result

    Completed and handed over

    5 photos · click to enlarge

    • Prayer room on the workshop grounds
    • Canopy-covered waiting area
    • Aerial view of the entire workshop complex
    • Yard, garden, and workshop after completion
    • Workshop façade after completion
    Prayer room on the workshop grounds
    Prayer room on the workshop grounds · 1/5

/ Start a project

Tell us your plans. We’ll help bring them to life.

Send your requirements, location, and photos of the current condition via WhatsApp. We’ll reply with the next steps.

Chat on WhatsApp
Company
/M2 Project
Base
Yogyakarta
Service area
Java and Bali