Project story
Construction began with filling and grading nearly 400 truckloads of soil on a 250 m² site, followed by levelling and compaction before the construction phase.
The building uses an IWF steel structure fabricated by our team, with comprehensive civil works from structural to architectural. The project also included widening a bridge and building a 5-metre-span access road over a 5-metre-wide drainage channel.
Through /M2 Project's design and planning, the workshop was developed into three main complexes: Workshop, Customer, and Administration. The complex includes an open area with a shady, green garden, as well as a comfortable waiting lounge with a billiard table and PlayStation.
We completed all of the work wholeheartedly and responsibly, delivering one of the largest and most comfortable suspension workshops in Indonesia.