Project story

Kadisoka House is a residential construction project covering a wide range of work, from the structure through to exterior elements and supporting home facilities. The work was carried out in stages, with attention to construction quality, precise detailing, and a balance between function and aesthetics.

The scope included the concrete structure as the building's main load-bearing element, fabrication and installation of IWF steel for structural needs, and the construction of a swimming pool with water filtration and circulation systems. The work also covered the bathrooms, a gazebo as a place to relax, and a carport to complete the home's facilities.

For the swimming pool, special attention was given to the pool construction, circulation, and filtration so that water quality and clarity are well maintained. Meanwhile, the exterior was arranged to create a more comfortable, green, and attractive living environment.

Every stage of the work was thoroughly documented, from rebar installation and structural work to the final stage when the pool was filled and ready to use. Through planned and detailed workmanship, Kadisoka House is designed to be a sturdy, functional home that offers comfort to everyone who lives there.

Work stages

  1. 1

    IWF steel fabrication

    The main upper-floor structure and staircase were fabricated, then assembled on site.

  2. 2

    Swimming pool

    Rebar, casting the pool walls, then pool finishing.

  3. 3

    Circulation & filtration

    Pump, sand filter, and pipework in an enclosed service room.

  4. 4

    Finishing

    Gazebo, ceilings, pool deck flooring, and landscaping.

Before & after

From the initial condition to completion

Swimming pool and house at dusk, Kadisoka House
Team clearing the overgrown land, Kadisoka House
Initial conditionFinal result
Drag to compare
Initial condition: Team clearing the overgrown landFinal result: Swimming pool and house at dusk
Documentation

Construction process

Photos in order, from the start to handover.

  1. 1
    Initial condition

    Initial condition & site preparation

    5 photos · click to enlarge

    • Team clearing the overgrown land
    • Entrance gate and building materials
    • Materials and concrete culverts on site
    • Building a lightweight-block fence
    • Perimeter fence with scaffolding
    Team clearing the overgrown land
    Team clearing the overgrown land · 1/5
  2. 2
    Construction

    Foundations & tie beams

    3 photos · click to enlarge

    • Rebar for tie beams and columns
    • Tie beams and lightweight-block walls
    • Tie-beam rebar detail
    Rebar for tie beams and columns
    Rebar for tie beams and columns · 1/3
  3. 3
    Construction

    IWF steel fabrication

    5 photos · click to enlarge

    • IWF steel columns being erected
    • Installing IWF steel beams
    • Upper floor frame
    • Steel roof frame
    • Steel canopy frame
    IWF steel columns being erected
    IWF steel columns being erected · 1/5
  4. 4
    Construction

    Floor slab casting

    Formwork and floor slab casting, Kadisoka House
    Formwork and floor slab casting
  5. 5
    Construction

    Swimming pool & filtration system

    4 photos · click to enlarge

    • Swimming pool construction
    • Pool pump room and sand filter
    • Filling the pool and installing the pool ladder
    • Cleaning the pool before handover
    Swimming pool construction
    Swimming pool construction · 1/4
  6. 6
    Construction

    Gazebo & bathrooms

    5 photos · click to enlarge

    • Gazebo columns worked on into the night
    • Installing the gazebo ceiling
    • Installing the bathtub
    • Bathroom wall tiles
    • Shower and bathtub installed
    Gazebo columns worked on into the night
    Gazebo columns worked on into the night · 1/5
  7. 7
    Construction

    Façade, carport & garden

    6 photos · click to enlarge

    • Front canopy frame
    • Carport and steel staircase
    • Finishing the gazebo ceiling
    • Garden and steel staircase
    • Wood-panel façade of the two-storey building
    • The complex nearing completion
    Front canopy frame
    Front canopy frame · 1/6
  8. Final result

    Completed and handed over

    12 photos · click to enlarge

    • Front view of the building
    • Carport with ceiling lights
    • Garden and row of rooms
    • Covered carport
    • Gazebo facing the pool
    • Lounge in the gazebo facing the pool
    • Gazebo and pool at night
    • Swimming pool with underwater lights
    • Swimming pool and gazebo
    • Poolside lounge area
    • House and swimming pool after completion
    • Swimming pool and house at dusk
    Front view of the building
    Front view of the building · 1/12

/ Start a project

Tell us your plans. We’ll help bring them to life.

Send your requirements, location, and photos of the current condition via WhatsApp. We’ll reply with the next steps.

Chat on WhatsApp
Company
/M2 Project
Base
Yogyakarta
Service area
Java and Bali